Featured

Site Work & Planning History

What has been built, what was spent, what was designed, and what a buyer should verify. Everything here can be inspected or checked.

1. Work completed

Existing condition
  • Site grading, creating usable building areas on the hillside.
  • Tiered retaining walls built during the site preparation (about 2009).
  • The owner reports no observed signs of retaining-wall failure or movement since approximately 2009.
Retaining walls and graded pad, current condition.

2. Historical investment

More than $900,000 was spent around 2009 on site preparation, planning and miscellaneous site costs (owner figures).

Retaining walls$490,000
Grading$320,000
Plans, permits & engineering$110,000
Miscellaneous site costs$60,000

Total ≈ $980,000

Plan excerpt from the previous design.

3. Previous residential design

Historical plan

Plans for a residence of approximately 11,000 sq ft were previously approved. They give buyers a documented design and planning history to evaluate: how the site was studied, where a home was placed, and how it relates to the graded areas.

Prior approval is history, not a guarantee. It does not promise faster approval, automatic reinstatement, current buildability, or permission to build the same size residence today.

Market interest

A $1,555,000 offer was associated with a pending sale on June 16, 2020. The transaction did not close; the reason is unknown. The same buyer was in contract on the unfinished ~19,000 sq ft residence next door, and additional outdoor space may have motivated the interest.

4. Available supporting documents

  • Previously approved residential plan set (excerpts available on request)
  • Floor plan excerpt for the ~11,000 sq ft design
  • Site photographs of the grading and retaining walls
  • Owner summary of site preparation costs
  • Pending-sale record from June 16, 2020 (offer of $1,555,000)

5. Current status & questions to confirm

  • Approval date, conditions and current status of the prior plans (verify with City of Oakland records).
  • Whether any permits remain active, have expired, or would need to be resubmitted.
  • Current zoning, setbacks and size limits that would apply to a new design today.
  • Retaining wall condition: the owner reports no observed failure or movement; buyers should commission their own geotechnical and structural review.
  • Utility availability and connection costs.